harlemschool_slide
East HARLEM SCHOOLThe new construction of East Harlem School features VaproShield WallShield and three colors of Trespa Meteon.
Slide-03
Whitehall Station The $530 M renovation of the South Ferry Terminal and Whitehall Station features Cladding Corp’s porcelain stones. NYC Transit required a mechanically fixed attachment that offered a long term cladding solution.
Slide-02
Julliard The Tully Hall Expansion at Julliard features a canopy from Cladding Corp. The critically acclaimed cantilevered canopy required a fully-engineered fiber cement cladding system that was based on the unique structural needs of the design.